Slowly getting there
Now finally we can see the concrete going back in. The concrete has been poured in and moved around to fill all the opening and reduce the chances of voids in the final floor. At this stage it is important to ensure all the reinforcing bars are encased in concrete to produce one solid floor that is locked into the existing factory floor area.
Top finish starting
Th new concrete floor has to be flat ready for the arrival of our new Trumpf 3030 laser cutter on 22nd October. The floor is rolled and then power floated to produce a smooth even surface in line with the existing factory floor.
Main concrete level now finished
The floor ready for power floating. Power floating can begin once it has dried out more and ready to walk on, now the wait begins.